| 1 |
CONCRETE PLACEMENT
Using rakes, simply spread the
concrete as uniformly as possible |
| 2 |
LEVELING POINTS
The first step is to draw four leveling points at a distance corresponding to the length of the blade used. This
makes it possible to determine the concrete level required
under existing standards. |
| 3 |
MARKING
Once the leveling points are established,
it’s time to use the Magic Screed blade. All
you have to do is level the concrete
between the wet pads on both sides of
your central unleveled path. |
| 4 |
LEVELING
With the help of no more than one or two rakers who remove or add concrete as
needed, all you have to do is screed the prepared section of concrete. This will
take only a few minutes. Repeat the
process for each new section. |
| |
|