
Using rakes, simply spread the concrete as
uniformly as possible.

The second step is to draw four leveling points at a distance corresponding to the length of the blade used. This makes it possible to determine the concrete level required under existing standards.

Once the leveling points are established, it's time to use the Magic Screed blade. All you have to do is level the concrete between the markings on both sides of your central unleveled path.

With the help of no more than one or two rakers who remove or add concrete as needed, you can now easily screed the prepared section of concrete. This will take only a few minutes. Repeat the process for each new section.

Magic Screed Presented the E-Screed in Las Vegas at the Conexpo Convention show
Read moreMagic Screed yet again created quite a buzz with the one year anniversary of the launch of the E-SCREED.
Read more
Sales office : 4795, rue Louis-B.-Mayer, Laval, Québec, Canada H7P 6G5
Tel. : 1 (450) 978-0200 Fax : 1 (450) 682-6654 Toll Free : 1-877-978-0200 Email : info@magicscreed.com